AeroShakti

Case studies

Case Studies

Detailed write-ups of AeroShakti projects.

Case studies

Projects that turn waste into energy

From an eco-sensitive hill station to a hospital campus in central Mumbai, these are real AeroShakti and Aerocare projects — what the site needed, what we built, and what it delivers today.

Recharge your city with AeroShakti
Gas pipeline, valves and metering infrastructure

GTB Hospital Biomethanation Plant, Mumbai

Turning hospital food waste into renewable energy at one of Mumbai’s largest healthcare facilities, with a 2 MT per day on-site plant.

Read case study
Biogas digester tanks and process pipework at a working plant

Haji Ali Waste-to-Watts Centre, Mumbai

Turning an encroached municipal plot near Haji Ali into Mumbai’s first decentralised waste-to-energy success story, producing 120 m³ of biogas a day.

Read case study

Panchgani Municipal Council

Transforming a hill station into one of India’s leading waste management success stories, with 100% source segregation and a 6 TPD biomethanation plant.

Read case study

Get Started with AeroShakti

A simple way to start turning your food waste into renewable energy.

01
Connect With Us

CONNECT

Whether you are a hotel, hospital, residential community, institution, airport, food manufacturer or municipality, our team will assess your organic waste stream and recommend the most effective waste-to-energy solution. Every enquiry begins with a consultation focused on sustainability, operational efficiency and long-term value.

02
We Design Your Solution

TRANSFORM

Our experts evaluate your waste generation, available space and operational requirements to design a customised collection and processing solution. From container placement and collection schedules to regulatory compliance and commissioning, we ensure a seamless implementation tailored to your facility.

03
Transform Waste Into Value

BENEFIT

Your organic waste is transformed through advanced biomethanation into renewable biogas, green electricity and nutrient-rich organic fertiliser — reducing landfill dependence, lowering your carbon footprint and returning measurable value to your operation.

Get started

Ready to implement biogas solutions? Reach us for a free consultation.

Send us your waste volumes and location. You get an indicative plant size, expected gas output and a payback range within three working days.