Case Studies
Detailed write-ups of AeroShakti projects.
Projects that turn waste into energy
From an eco-sensitive hill station to a hospital campus in central Mumbai, these are real AeroShakti and Aerocare projects — what the site needed, what we built, and what it delivers today.
GTB Hospital Biomethanation Plant, Mumbai
Turning hospital food waste into renewable energy at one of Mumbai’s largest healthcare facilities, with a 2 MT per day on-site plant.
Read case study
Haji Ali Waste-to-Watts Centre, Mumbai
Turning an encroached municipal plot near Haji Ali into Mumbai’s first decentralised waste-to-energy success story, producing 120 m³ of biogas a day.
Read case study
Panchgani Municipal Council
Transforming a hill station into one of India’s leading waste management success stories, with 100% source segregation and a 6 TPD biomethanation plant.
Read case studyGet Started with AeroShakti
A simple way to start turning your food waste into renewable energy.
CONNECT
Whether you are a hotel, hospital, residential community, institution, airport, food manufacturer or municipality, our team will assess your organic waste stream and recommend the most effective waste-to-energy solution. Every enquiry begins with a consultation focused on sustainability, operational efficiency and long-term value.
TRANSFORM
Our experts evaluate your waste generation, available space and operational requirements to design a customised collection and processing solution. From container placement and collection schedules to regulatory compliance and commissioning, we ensure a seamless implementation tailored to your facility.
BENEFIT
Your organic waste is transformed through advanced biomethanation into renewable biogas, green electricity and nutrient-rich organic fertiliser — reducing landfill dependence, lowering your carbon footprint and returning measurable value to your operation.
Ready to implement biogas solutions? Reach us for a free consultation.
Send us your waste volumes and location. You get an indicative plant size, expected gas output and a payback range within three working days.